No. E-Procurement / Tender Call Notice No.(02) of 2011-12
|
|
ISSUING AUTHORITY
|
:
|
EE-CWD-1 |
|
|
|
PLEASE VISIT THE WEBSITE http://tendersorissa.gov.in FOR FURTHER DETAILS.(TENDERING WILL BE DONE THROUGH E-TENDERING PROCESS ONLY.
|
|
|
|
|
No. Sr.G.M. CPC- 01/2012-13
|
|
ISSUING AUTHORITY
|
:
|
Sr. GM (CPC) |
|
SCOPE OF WORK
|
:
|
INTERNAL ELECTRIFICATION OF RESIDENCE OFFICE OF THE DIRECTOR(ENGG), OPTCL AT B-1, SLDC COLONY,MANCHESWAR,BHUBANESWAR .
|
|
|
|
Duration of Sale |
|
02.02.2012 to 13.02.2012 upto 1.00PM |
|
|
Last Date of Receipt |
|
13.02.2012 upto 1.00PM |
|
|
Date
Of Opening |
|
13.02.2012 at 4.00PM |
|
|
|
|
|
|
|
|
|
No. TW-IT-OT-03/2011-12
|
|
ISSUING AUTHORITY
|
:
|
CGM(IT) |
|
SCOPE OF WORK
|
:
|
Supply, installation and demonstration of the following Software items with latest and
most recent version of media, manuals and paper licenses as specified by M/s RHEL
conforming to the Specification, quality & quantity as per order.
The software's with
paper licenses and related deliverables shall be ultimately owned by GRIDCO.
|
|
|
|
|
|
|
|
|
Last Date of Receipt |
|
14.02.2012, 1:30 PM |
|
|
Date
Of Opening |
|
14.02.2012,
3:30 PM |
|
|
|
|
|
|
|
|
No.-TW-IT-LT-03/2011-12 |
|
ISSUING AUTHORITY
|
:
|
CGM(IT) |
|
SCOPE OF WORK |
|
Quick Heal Anti Virus
Plus Admin Console 4.6 with additional User License (38 Users) |
|
|
|
Duration of Sale |
|
|
|
Last Date of Receipt |
|
15.02.2012
upto 01.30 P.M
09.02.2012 upto 01.30 P.M
02.02.2012 upto 01.30 P.M |
|
Date
Of Opening |
|
15.02.2012
at 03.30 P.M
09.02.2012 at 03.30 P.M
02.02.2012 at 03.30 P.M |
|
|
|
|
|
|
|
No.-TW-IT-ST-02/2011-12 |
|
ISSUING AUTHORITY
|
:
|
CGM(IT) |
|
SCOPE OF WORK |
|
Procurement of Fire extinguishers, digital thermometer,
digital hygrometer. |
|
|
|
Duration of Sale |
|
|
|
Last Date of Receipt |
|
27-12-2011, 1:30 PM |
|
Date
Of Opening |
|
27-12-2011, 3:30 PM
|
|
|
|
|
|
|
|

|
|
No.-
G.M.-TELECOM -TENDER-SVS & BATTERIES |
|
ISSUING AUTHORITY
|
:
|
G.M(Telecommunication) |
|
SCOPE OF WORK |
|
Procurement of SVS and
Batteries |
|
|
|
Duration of Sale |
|
From 01.12.2011 to
21.12.2011 |
|
Last Date of Receipt |
|
22.12.2011
at 1.00PM |
|
Date
Of Opening |
|
22
.12.2011 AT 4.00PM
|
|
|
|
|
|
|
|
No.-TW-IT-OT/02/2011-12 |
|
ISSUING AUTHORITY
|
:
|
Chief General Manager (IT) |
|
SCOPE OF WORK |
|
Procurement of Software Items |
|
|
|
Duration of Sale |
|
|
|
Last Date of Receipt |
|
09.12.2011 AT
01.30 P.M.
14.12.2011 at
01.30P.M |
|
Date
Of Opening |
|
09.12.2011 AT 15.30
P.M.
14.12.2011 AT
15:30 P.M
|
|
|
|
|
|
|
|
Short Quotation Call Notice No
3 |
|
ISSUING AUTHORITY
|
:
|
Sr.G.M(CPC) |
|
SCOPE OF WORK |
|
Supply & Installation of 1No. 1.5Ton Split A.C Machine(Having 5 Star rating ) with
5.0KVA Automatic Voltage stabilizer (wall Mounted) for Residence office of CMD,OPTCL,
Bhubaneswar. |
|
|
|
Duration of Sale |
|
|
|
Last Date of Receipt |
|
25.11.2011
at 1.00PM |
|
Date
Of Opening |
|
25
.11.2011 AT 4.00PM
|
|
|
|
|
|
|
|
No.- SR. G.M (C.P.C.) -79/2011-12 |
|
ISSUING AUTHORITY
|
:
|
Sr.G.M(CPC) |
|
SCOPE OF WORK |
|
SUPPLY, INSTALLATION,
TESTING & COMMISSIONING OF 1NO. 10 PASSENGERS ELEVATOR |
|
|
|
Duration of Sale |
|
10 A.M. to 3 P.M. during dt. 16 .11.2011
to 02.12.2011 (both days inclusive) |
|
Last Date of Receipt |
|
02.12.2011 at 1.00PM |
|
Date
Of Opening |
|
02 .12.2011 AT 4.00PM
|
|
|
|
|
|
|
|
No.- SR. G.M-CPC-TENDER-400KV
LAPANGA-68/2011
|
|
ISSUING AUTHORITY
|
:
|
Sr. G.M., CPC |
|
|
|
Duration Of Sale |
5th November 2011 to 19th December 2011 (10:00 Hrs to 17:00 Hrs). |
|
1. Package- 68-01
- Vol I
(Bidding Instruction)
-
Vol I A
(Condition Of Contract)
-
Vol I B
-
Vol II
-
Vol II A
-
Vol
I B Package (Doc)
-
BPS
(Excel)
|
Last Date & Time of
Receipt of Bid
20th December 2011
up to 13 Hrs (IST) 20th January 2012Up to 13:00
Hrs
14th February 2012Up to 13:00
Hrs 28th February 2012 Up to 13:00
Hrs |
|
|
|
|
|
|
|
|
No: SR. G.M. (C.P.C.) - 76/2011-12
|
|
ISSUING AUTHORITY
|
:
|
Sr.G.M(CPC) |
|
SCOPE OF WORK |
|
UPGRADATION & MODIFICATION OF INTERNAL
ELECTRIFICATION OF GRIDCO DATA CENTRE, A.W BUILDING, BHOI
NAGAR,OPTCL,BHUBANESWAR |
|
|
|
Duration of Sale |
|
10 A.M. to 3 P.M. during dt. 01 .11.2011
to 25 .11.2011 (both days inclusive) |
|
Last Date of Receipt |
|
25.11.2011 at 1.00PM |
|
Date
Of Opening |
|
25 .11.2011 AT 4.00PM
|
|
|
|
|
|
|
|
No.- SR. G.M-CPC-TENDER-PACKAGE-
66-01/2011 & 66-02 /2011
|
|
ISSUING AUTHORITY
|
:
|
Sr. G.M., CPC |
|
|
|
|
No:Sr.G.M.CPC-O&M-OIL-72/2011-12
|
|
ISSUING AUTHORITY
|
:
|
Sr.G.M(CPC) |
|
SCOPE OF WORK |
|
Supply of EHV grade Naphthenic Base Transformer oil (300 K.L.) |
|
|
|
Duration of Sale |
|
03.11.2011 TO 28.11.2011 (FROM 10 AM TO 1 P.M.) |
|
|
Last Date of Receipt |
|
28.11.2011, 1 P.M.
|
|
|
Date
Of Opening |
|
28.11.2011, 3.30 P.M.
|
|
|
|
|
|
|
|
|
|
Sr.GM-CPC-TENDER-Hydraulic Compressor M/C-77/11-12
|
|
ISSUING AUTHORITY
|
:
|
Sr.G.M(CPC) |
|
SCOPE OF WORK |
|
supply of 150 Ton capacity Hydraulic Compressor Machine |
|
|
|
Duration of Sale |
|
01.11.2011 TO 30.11.2011 (FROM 10 A.M. TO 1 P.M.) |
|
|
Last Date of Receipt |
|
30.11.2011, 1 P.M.
|
|
|
Date
Of Opening |
|
30.11.2011, 4 P.M.
|
|
|
|
|
|
|
|
|
|
Sr. GM-CPC-Hard Ware Fittings(Conductor -70/2011)
|
|
ISSUING AUTHORITY
|
:
|
Sr.G.M(CPC) |
|
SCOPE OF WORK |
|
PROCUREMENT OF HARD WARE FITTINGS FOR CONDUCTOR OF TRANSMISSION LINES OF OPTCL |
|
|
|
Duration of Sale |
|
:01.11.2011 to 01.12.11 (FROM 10 AM TO 5 P.M.) |
|
|
Last Date of Receipt |
|
02.12.2011,
1 P.M.
|
|
|
Date
Of Opening |
|
02.12.2011, 3.30 P.M
|
|
|
|
|
|
|
|
|
|
Sr.GM-CPC-Earthwire73/2011
|
|
ISSUING AUTHORITY
|
:
|
Sr.G.M(CPC) |
|
SCOPE OF WORK |
|
PROCUREMENT OF G.I GROUND WIRES (7/3.15 mm) |
|
|
|
Duration of Sale |
|
:02.11.2011 to 02.12.11 (FROM 10 A.M. TO 3.30 P.M.) |
|
|
Last Date of Receipt |
|
03.12.2011, 1 P.M.
|
|
|
Date
Of Opening |
|
03.12.2011, 3.30 P.M
|
|
|
|
|
|
|
|
|
|
No: Sr.G.M.-CPC-TENDER-O&M-ISO-71/2011-12
|
|
ISSUING AUTHORITY
|
:
|
Sr. G.M(CPC) |
|
SCOPE OF WORK |
|
PROCUREMENT OF ISOLATORS (220 KV, 132 KV & 33 KV) |
|
|
|
Duration of Sale |
|
24.10.2011 TO 18.11.2011 (FROM 10 A.M. TO 1 P.M.) |
|
|
Last Date of Receipt |
|
19.11.2011, 1 P.M.
|
|
|
Date
Of Opening |
|
19.11.2011, 3:30 P.M.
|
|
|
|
|
|
|
|
|
|
No:TW-IT-LT-02/2011-2012
|
|
ISSUING AUTHORITY
|
:
|
CGM(IT) |
|
SCOPE OF WORK |
|
Procurement of IT Consumables |
|
|
|
|
|
|
|
|
Last Date of Receipt |
|
08.11.2011, 1:30 P.M. |
|
|
Date
Of Opening |
|
08.11.2011, 4.00 P.M.
|
|
|
|
|
|
|
|
|
|
Sr.GM-CPC-Tender-VT-15/2011
|
|
ISSUING AUTHORITY
|
:
|
Sr G.M. (CPC) |
|
SCOPE OF WORK |
|
PROCUREMENT OF Voltage Transformer |
|
|
|
Duration of Sale |
|
03.11.2011 TO 28.11.2011 (FROM 10 AM TO 1 PM) |
|
|
Last Date of Receipt |
|
29.11.2011( 1.00 PM)
|
|
|
Date
Of Opening |
|
29.11.2011(3.00 PM)
|
|
|
|
|
|
|
|
|
|
Sr.GM-CPC-Tender-CT-14/2011
|
|
ISSUING AUTHORITY
|
:
|
Sr G.M. (CPC) |
|
SCOPE OF WORK |
|
PROCUREMENT OF Current Transformer |
|
|
|
Duration of Sale |
|
03.11.2011 TO 28.11.2011 (FROM 10 AM TO 1 PM) |
|
|
Last Date of Receipt |
|
29.11.2011( 1.00 PM)
|
|
|
Date
Of Opening |
|
29.11.2011(3.00 PM)
|
|
|
|
|
|
|
|
|
|
Sr.GM-CPC-Tender-Breaker-75/2011
|
|
ISSUING AUTHORITY
|
:
|
Sr G.M. (CPC) |
|
SCOPE OF WORK |
|
PROCUREMENT OF Breaker |
|
|
|
Duration of Sale |
|
04.11.2011 TO 24.11.2011 (FROM 10 AM TO 1 P.M.) |
|
|
Last Date of Receipt |
|
25.11.2011( 1.00 P.M.)
|
|
|
Date
Of Opening |
|
25.11.2011(3.30 P.M.)
|
|
|
|
|
|
|
|
|
|
Sr.G.M.-CPC-TENDER-B& C-74/2011-12
|
|
ISSUING AUTHORITY
|
:
|
Sr. G.M(CPC) |
|
SCOPE OF WORK |
|
PROCUREMENT OF 220 Volt Battery Set and 220 V Battery Charger |
|
|
|
Duration of Sale |
|
29.10.2011 TO 19.11.2011 (FROM 10 AM TO 1 PM) |
|
|
Last Date of Receipt |
|
19.11.2011, 1 P.M.
|
|
|
Date
Of Opening |
|
19.11.2011, 4 P.M.
|
|
|
|
|
|
|
|
|
|
No.: Expression of Interest for Providing Skilled Man Power
|
|
ISSUING AUTHORITY
|
|
CGM(O&M) |
|
|
|
|
|
|
|
|
|
|
|
|
Last Date of Receipt |
|
30.10.2011 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
No: Sr.G.M.-CPC-TENDER-R/C, TLT Str (LINE AND S/S)-64/2011-12
|
|
ISSUING AUTHORITY
|
:
|
Sr. G.M(CPC) |
|
SCOPE OF WORK |
|
ENLISTMENT AS RATE CONTRACT HOLDER FOR SUPPLY OF 400 KV, 220 KV, 132 KV, 33 KV TRANSMISSION LINE AND S/S STRUCTURES AS PER OPTCL'S OWN DESIGN.
|
|
|
|
Duration of Sale |
|
25.10.2011, 11 AM TO 14.11.2011, 5PM |
|
|
Last Date of Receipt |
|
15.11.2011, 1 P.M.
|
|
|
Date
Of Opening |
|
15.11.2011, 3 P.M.
|
|
|
|
|
|
|
|
|
|
No.: Expression of Interest for Providing Skilled Man Power
|
|
ISSUING AUTHORITY
|
|
CGM (O&M) |
|
|
|
|
|
|
|
|
|
|
|
|
Last Date of Receipt |
|
15.10.2011 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
No EMC-91/2011/9207
|
|
|
|
|
|
Scope of Work
|
: |
Internal electrification of temporary training hostel at
Mendhasal Grid S/S, OPTCL Bhubaneswar
|
|
|
|
Duration of Sale |
|
07.10.2011, 1 PM to 21.10.2011, 1 PM |
|
|
Last Date of Receipt |
|
21.10.2011, 1 PM |
|
|
Date
Of Opening |
|
21.10.2011, 4 PM
|
|
|
|
|
|
|
|
|
|
Expression of Interest for 33KV Bus Up-Gradation Turn-key Projects
|
|
ISSUING AUTHORITY
|
:
|
CGM(O&M) |
|
|
|
|
|
|
|
|
|
|
|
|
Last Date of Receipt |
|
15.10.2011 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
TW-IT-OT-01/2011-12
|
|
ISSUING AUTHORITY
|
:
|
Chief General Manager(IT) |
|
Scope of Work
|
:
|
Procurement of software item.
|
|
|
|
|
|
|
|
|
Last Date of Receipt |
|
27-10-2011,
1:30 P.M.
|
|
|
Date
Of Opening |
|
27-10-2011, 3:30 P.M.
|
|
|
|
|
|
|
|
|
|
No: Sr.GM-CPC-O&M-CONST.-CONDUCTOR-AAAC- 60/11-12
|
|
ISSUING AUTHORITY
|
:
|
Sr G.M. (CPC) |
|
SCOPE OF WORK |
|
LOT-I-.AAAC ‘ZEBRA’ Conductor(37/4mm) LOT-II-AAAC ‘PANTHER’Conductor (37/3.15mm)
|
|
|
|
Duration of Sale |
|
30.09.2011 to 22.10.2011 (10:00 A.M. to 1:00 P.M.) |
|
|
Last Date of Receipt |
|
22.10.2011, 1:00 P.M.
|
|
|
Date
Of Opening |
|
22.10.2011, 3:30 P.M.
|
|
|
|
|
|
|
|
|
|
No.- Sr. G.M-CPC-TENDER-PACKAGE- 61-01, 61-02 &
61- 03/2011-12
|
|
ISSUING AUTHORITY
|
:
|
Sr. G.M., CPC |
|
|
|
|
No.: TW-IT-ST-01/2011-12
|
|
ISSUING AUTHORITY
|
:
|
Chief General Manager(IT) |
|
|
|
|
|
|
|
|
|
|
|
|
Last Date of Receipt |
|
19-09-2011, 1:30 P.M.
|
|
|
Date
Of Opening |
|
19-09-2011, 3:30 P.M.
|
|
|
|
|
|
|
|
|
|
No.: TW-IT-LT-01/2011-12
|
|
ISSUING AUTHORITY
|
:
|
Chief General Manager(IT) |
|
|
|
|
|
|
|
|
|
|
|
|
Last Date of Receipt |
|
19-09-2011, 1:30 P.M.
|
|
|
Date
Of Opening |
|
19-09-2011, 3:30 P.M.
|
|
|
|
|
|
|
|
|
|
No.- EMC- 57 / 09/ 8756(7)
|
|
ISSUING AUTHORITY
|
:
|
Sr. G.M. (CPC) |
|
SCOPE OF WORK
|
:
|
Supply of 400 mm Pedestal Fan with all accessories |
|
|
|
|
|
|
|
|
Last Date of Receipt |
|
30-09-2011, 1 P.M.
|
|
|
Date
Of Opening |
|
30-09-2011, 4 P.M.
|
|
|
|
|
|
|
|
|
|
No.- Sr.GM(CPC)-AC Machine-05/ 10/ 8786(7)
|
|
ISSUING AUTHORITY
|
:
|
Sr. G.M. (CPC) |
|
SCOPE OF WORK
|
:
|
Automatic Voltage Stabilizer (Wall Mounted) |
|
|
|
|
|
|
|
|
Last Date of Receipt |
|
30-09-2011, 1 P.M.
|
|
|
Date
Of Opening |
|
30-09-2011, 4 P.M.
|
|
|
|
|
|
|
|
|
|
Sr.GM-CPC-TENDER-132 KV CABLE - OPTCL - 55/2011
|
|
ISSUING AUTHORITY
|
:
|
Sr.General Manager (CPC) |
|
SCOPE OF WORK
|
:
|
Tender For
DESIGN, ENGINEERING, SUPPLY, ERECTION, TESTING & COMMISSIONING OF CONVERSION OF 132KV OVER HEAD TRANSMISSION LINE TO UNDERGROUND CABLE IN IDCO AREA NEAR CHANDAKA GRID SUB STATION, BHUBANESWAR |
|
|
|
|
No. ( 01 ) of 2011-12.
|
|
ISSUING AUTHORITY
|
:
|
Executive Engineer(Civil works DIV-I) |
|
SCOPE OF WORK
|
:
|
|
|
|
|
Duration of Sale |
|
26.07.2011, 11 AM to 10.08.2011, 5 PM |
|
|
Last Date of Receipt |
|
10.08.2011, 5 PM
|
|
|
Date
Of Opening |
|
16.08.2011, 11:30 AM
|
|
|
|
|
|
|
|
|
|
No:Sr G.M. CPC- RTV Silicon Coating/58/2011-12
|
|
ISSUING AUTHORITY
|
:
|
Sr. General Manager (CPC) |
|
SCOPE OF WORK
|
:
|
Tender For
SUPPLY
& APPLICATION OF RTV SILICON COATING ON INULATORS OF 220KV
& 132 SWITCH YARD
EQUIPMENTS AT 220/132/33 KV GRID SUBSTATION,
PARADEEP |
|
|
|
|
|

|
|
|
PDF FORMAT
|
|
|
|
Duration of Sale |
|
27.07.2011,10 AM
to 26.08.2011, 5 PM |
|
|
Last Date of Receipt |
|
27.08.2011, 1 PM
|
|
|
Date
Of Opening |
|
27.08.2011, 3:30 PM
|
|
|
|
|
|
|
|
|
|
No:Sr.GM-CPC-TENDER-INSULATOR-56/2011-12
|
|
ISSUING AUTHORITY
|
:
|
Sr. General Manager (CPC) |
|
SCOPE OF WORK
|
:
|
Tender For
supply of Normal Disc, Anti-Fog
& Long Rod Insulator |
|
|
|
|
|

|

|
|
PDF FORMAT
|
DOWN LOAD
|
|
|
Duration of Sale |
|
22.07.2011,10 AM to 22.08.2011, 5 PM |
|
|
Last Date of Receipt |
|
23.08.2011, 1 PM
|
|
|
Date
Of Opening |
|
23.08.2011, 3:30 PM
|
|
|
|
|
|
|
|
|
|
NO. Sr.GM-CPC-TENDER-SF6 GAS- 59 / 11-12
|
|
ISSUING AUTHORITY
|
:
|
Sr. General Manager (CPC) |
|
SCOPE OF WORK
|
:
|
Tender For
Tender for Procurement of SF6 GAS filled in cylinders of 50Kg each. |
|
|
|
|
|

|

|
|
PDF FORMAT
|
DOWN LOAD
|
|
|
Duration of Sale |
|
22.07.2011, 11 AM to 22.08.2011, 1 PM. |
|
|
Last Date of Receipt |
|
22.08.2011, 1 PM
|
|
|
Date
Of Opening |
|
22.08.2011, 4 PM
|
|
|
|
|
|
|
|
|
|
NO. 48 /2011-12
|
|
ISSUING AUTHORITY
|
:
|
Sr. General Manager (CPC) |
|
SCOPE OF WORK
|
:
|
Tender For
SUPPLY OF CONTROL CABLES FOR SUBSTATION WORK IN OPTCL’S SYSTEM |
|
|
|
|
|

|

|
|
PDF FORMAT
|
DOWN LOAD
|
|
|
Duration of Sale |
|
24.06.2011, 10.00 A.M. to 25.07.2011,
3.00 P.M. |
|
|
Last Date of Receipt |
|
26.07.2011, 01:30 P.M.
|
|
|
Date
Of Opening |
|
26.07.2011, 03:30 P.M.
|
|
|
|
|
|
|
|
|
|
NO. Sr. G.M. CPC 52/2011
|
|
ISSUING AUTHORITY
|
:
|
Sr. General Manager (CPC) |
|
SCOPE OF WORK
|
:
|
Tender For
DATA COLLECTION FROM ENERGY METERS INSTALLED AT DIFFERENT GRID
SUBSTATIONS IN OPTCL SYSTEM AND DIFFERENT POWER STATIONS IN THE
STATE OF ODISHA, PROCESSING OF COLLECTED DATA AND SUBMISSION AT
ERLDC , GRIDCO AND SLDC AS PER TECHNICAL SPECIFICATION. |
|
|
|
Duration of Sale |
|
02.06.2011, 10.00 A.M. to 28.06.2011,
3.00 P.M. |
|
|
Last Date of Receipt |
|
29.06.2011, 11:00 A.M.
|
|
|
Date
Of Opening |
|
29.06.2011, 03:30 P.M.
|
|
|
|
|
|
|
|
|
|
|
|
|
NO. Sr. G.M. CPC-TENDER-R/C-EMERGENCY/NORMAL WORK-47/2011
|
|
ISSUING AUTHORITY
|
:
|
Sr. General Manager (CPC) |
|
SCOPE OF WORK
|
:
|
Tender For
EXECUTION OF EMERGENCY/NORMAL WORKS IN 400 KV, 220 KV,132 KV & 33KV SUBSTATION AND LINES IN OPTCL SYSTEM |
|
|
|
Duration of Sale |
|
25.05.2011, 10.00 A.M. to 24.06.2011,
3.00 P.M. |
|
|
Last Date of Receipt |
|
24.06.2011, 01:30 P.M.
|
|
|
Date
Of Opening |
|
24.06.2011, 03:30 P.M.
|
|
|
|
|
|
|
|
1. PACKAGE-1
|
|
2. PACKAGE-2 |
|
|
|
|
NO. NIT No.CPC-45/2011
|
|
ISSUING AUTHORITY
|
:
|
Sr. General Manager (CPC) |
|
SCOPE OF WORK
|
:
|
Tender For
PROCUREMENT OF SELECTIVE LEVEL METER
& SELECTIVE LEVEL OSCILLATOR |
|
|
|
|
|

|

|
|
PDF FORMAT
|
DOWN LOAD
|
|
|
Duration of Sale |
|
11.05.2011, 10.00 A.M. to 03.06.2011, 2.00 P.M. |
|
|
Last Date of Receipt |
|
04.06.2011, 01:30 P.M.
|
|
|
Date
Of Opening |
|
04.06.2011, 03:30 P.M.
|
|
|
|
|
|
|
|
|
|
NO: Sr. GM-CPC-Konark-OPTCL-53/2011
|
|
ISSUING AUTHORITY
|
:
|
SR. GENERAL MANAGER [C.P.C.] |
|
SCOPE OF WORK
|
:
|
Tender for
Design, Engineering, Supply, Erection, Testing & Commissioning of 132/33 KV substation and associated system works at Konark along with 132KV bay extension work at Nimapara on turnkey basis in the state of Orissa.
|
|
|
|
|
NO.NIT-41/2011-12
|
|
ISSUING AUTHORITY
|
:
|
SR. GENERAL MANAGER [C.P.C.] |
|
SCOPE OF WORK
|
:
|
Tender for
PROCUREMENT OF
160 MVA, 220/132/33 KV AUTO TRANSFORMER –3NOS.
PROCUREMENT OF
20 MVA, 132/33 KV POWER TRANSFORMER –16 NOS in 2(Two) lots of 8 each.
|
|
|
|
|
NO. SR.G.M.[C.P.C.]- 49 /2011
|
|
ISSUING AUTHORITY
|
:
|
Sr. General Manager (CPC) |
|
SCOPE OF WORK
|
:
|
Tender For
PROVISION OF DOUBLE COPPER EARTHINGS TO UPS INSTALLED AT OPTCL MULTISTOREYED BUILDING, OPTCL, BHUBANESWAR |
|
|
|
|
|

|

|
|
PDF FORMAT
|
DOWN LOAD
|
|
|
Duration of Sale |
|
26.04.2011,10.00 A.M. to 20.05.2011,03.00 P.M. |
|
|
Last Date of Receipt |
|
20.05.2011, 03.00 P.M.
|
|
|
Date
Of Opening |
|
20.05.2011, 04.00 P.M.
|
|
|
|
|
|
|
|
|
|
NO.SRGM.[CPC]TelecomOPGW Stringing 48 / 2011
|
|
ISSUING AUTHORITY
|
:
|
SR. GENERAL MANAGER [C.P.C.] |
|
SCOPE OF WORK
|
:
|
Tender for
Stringing of OPGW in the diverted portion of 132KV line
ChandakaMancheswar ckt I |
|
|
|
|
NIT NO: NESCL/OPTCL/CS-OS-620
|
|
ISSUING AUTHORITY
|
:
|
OPTCL/NTPC-ESCL |
|
SCOPE OF WORK
|
:
|
Tender for
Design, Engineering, Supply, Erection, Testing & Commissioning of 132 KV Sub-Stations, transmission lines & associated system on turnkey basis in Marsaghai and Olavar. (Bid doc No: NESCL/OPTCL/CS-OS-620-01). And 220KV in Dhamara (Bid Doc No:NESCL/OPTCL/CS-OS-620-02 )
|
|
|
|
|
NO. SR.G.M.CPCTENDER– CMRI 44 /2011
|
|
ISSUING AUTHORITY
|
:
|
Sr. General Manager (CPC) |
|
SCOPE OF WORK
|
:
|
Tender For
PROCUREMENT OF
COMMON METER READING INSTRUMENT |
|
|
|
|
|

|

|
|
PDF FORMAT
|
DOWN LOAD
|
|
|
Duration of Sale |
|
11.04.2011, 10.00 AM to 10.05.2011, 05.00 PM |
|
|
Last Date of Receipt |
|
11.05.2011 upto 11.00 AM
|
|
|
Date
Of Opening |
|
11.05.2011, 03.30 PM
|
|
|
|
|
|
|
|
|
|
NO: NIT-TP-37/2011
|
|
ISSUING AUTHORITY
|
:
|
Sr. General Manager (CPC) |
|
SCOPE OF WORK
|
:
|
Tender for
DESIGN, ENGINEERING, SUPPLY, ERECTION, TESTING & COMMISSIONING OF 132/33 KV SUBSTATION, 132KV BAY EXTENSION ALONG WITH TRANSMISSION LINES AND ASSOCIATED SYSTEMS ON TURNKEY BASIS AT KHAJURIAKATA, NUAPATANA, SALIPUR & KENDRAPARA LOCATIONS IN
THE STATE OF ORISSA.
|
|
|
|
|
NO.AW-LW-VII-7/2006(PART)/5436
|
|
ISSUING AUTHORITY
|
:
|
AGM(HRD)-I |
|
SCOPE OF WORK
|
:
|
Tender For
Deployment of Security Personnel |
|
|
|
|
|

|

|
|
PDF FORMAT
|
DOWN LOAD
|
|
|
Duration of Sale |
|
31.03.2011, 10.00 AM to 15.04.2011, 03.00 PM |
|
|
Last Date of Receipt |
|
15.04.2011 upto 03.30 PM
|
|
|
Date
Of Opening |
|
16.04.2011, 03.00 PM
|
|
|
|
|
|
|
|
|
|
NIT NO: NESCL/OPTCL/CS-OS-619
|
|
ISSUING AUTHORITY
|
:
|
OPTCL/NTPC-ESCL |
|
SCOPE OF WORK
|
:
|
Tender for
CONSTRUCTION OF SUBSTATION ALONG
WITH TRANSMISSION LINE & ASSOCIATED
SYSTEMS
|
|
|
|
|
NO.SR.G.M.-CPC -TELECOM-LT & CVT-42 / 2010-11
|
|
ISSUING AUTHORITY
|
:
|
SR. GENERAL MANAGER [C.P.C.] |
|
SCOPE OF WORK
|
:
|
Tender for
LOT-I- 800A,0.5mH LINE TRAP FOR 132KV- 28Nos.
1250A,1.0MH LINE TRAP FOR 220KV - 2Nos
LOT-II-132KV CAPACITIVE VOLTAGE TRANSFORMER-24 Nos.
220KV CAPACITIVE VOLTAGE TRANSFORMER- 7Nos.
|
|
| | | | |